| LINE | Name | Country | City | Regional Rail | |||
| Line 1 southern | BG | Sofia | No | ||||
| CONSTRUCTION DETAILS | Start year | End year | Length (in km) | Tunnel (in km) | Tunnel | Stations | Source |
| 2013 | 2015 | 3.0 | 3.0 | 100% | 3 | Media | |
| COST INFORMATION | Cost (in M) | Currency | PPP rate | Year PPP | Real cost (in M$) | Cost/km (in M$) | Source |
| 44.0 | EUR | 3.32 | 2014 | 167.2 | 55.7 | Media | |
| REFERENCE | https://www.novinite.com/articles/168384/Subway+Extension+to+Business+Park+Sofia+Opens | ||||||
| NOTES | The ‘Real cost’ values have been adjusted for inflation and PPP. Sections of the line constructed in trench are represented with the same line style as the at-grade sections. The project maps are based on information retrieved from OpenStreetMap and our research. Please contact us if you have more accurate information regarding this project. |
||||||
| Go to Sofia city page. | |||||||
| CARVIEW |
Select Language
HTTP/2 301
x-powered-by: PHP/8.2.29
x-redirect-by: WordPress
location: https://transitcosts.com/sofia-line-1-southern/
cache-control: max-age=5, public
expires: Tue, 03 Feb 2026 18:30:15 GMT
vary: User-Agent,Accept-Encoding
content-length: 0
content-type: text/html; charset=UTF-8
date: Tue, 03 Feb 2026 18:30:10 GMT
server: Apache
HTTP/2 200
x-powered-by: PHP/8.2.29
link: ; rel="https://api.w.org/", ; rel="alternate"; title="JSON"; type="application/json", ; rel=shortlink
cache-control: max-age=5, public
expires: Tue, 03 Feb 2026 18:30:16 GMT
vary: Accept-Encoding,User-Agent
content-encoding: gzip
content-length: 9444
content-type: text/html; charset=UTF-8
date: Tue, 03 Feb 2026 18:30:11 GMT
server: Apache
Sofia Line 1 southern – Transit Costs Project
Skip to content
admin2023-02-08T02:18:29-05:00
Page load link
Go to Top