Renewables Success Stories
Chisineu-Cris, Full EPC, 54 MWp project for NEPI Rockcastle.
The Chişineu-Criş Photovoltaic Power Plant (54.11 MWp) has been successfully completed including energization, after 8 months of construction. As EPC contractor, ENEVO Group delivered LSTK (Lump sum turnkey) project full engineering, procurement, and construction works for the solar plant, transforming design into real performance.
Developed for NEPI Rockcastle in collaboration with LONGi Solar Europe, is the first project that integrates LONGi’s Hi-MO9 modules with new back-contact technology, ensuring higher efficiency and long-term reliability. Spanning over 200,000 m² and equipped with advanced Sungrow inverter systems, the Chişineu-Criş PV Plant stands among the most innovative renewable energy projects in the region.